MEP Drafting · Plumbing

Plumbing & Drainage Drawings, Construction-Ready.

We draft sanitary drainage layouts, cold and hot water supply distribution, fixture schedules and riser diagrams — coordinated with architectural and structural drawings to produce buildable, code-compliant plumbing documentation.

Typical turnaround: 3–5 days

What's Included

Sanitary Drainage Layout

Floor drainage, pipe runs, fall gradients, inspection access points and connection to sewer or septic shown on plan.

Water Supply Distribution

Cold water, hot water and recirculation pipe runs with pipe sizes, isolation valves and fixture connections.

Riser Diagrams

Vertical riser diagrams showing floor-by-floor distribution of water supply and drainage systems.

Fixture Schedule

Plumbing fixture schedule listing type, model reference, water consumption and waste connection for all wet area fixtures.

Deliverables

  • AutoCAD .DWG plumbing drawings
  • PDF at 1:50 / 1:100
  • Riser diagrams
  • Fixture schedule in Excel

Tools & Software

AutoCADAutoCAD MEPRevit MEP
← Back to MEP Drafting

Supporting Firms Across North America, Europe, the Middle East & Asia-Pacific

Get In Touch

Ready to Start
Building?

Let's discuss how we can support your next project. Reach out and our team will get back to you within 24 hours.

Office

Headquartered in Calicut, Kerala, India
with a globally distributed remote team.